This is the restaurant location for Corkers from beginning to current.
Tuesday, November 9, 2010
A double sink has now been installed in the wash-up area in the kitchen. A tiler is in there as we speak putting back the tiles along the sink and also along the top of the metal work surface to prevent water leaking down the back!
No comments:
Post a Comment