Sunday, October 31, 2010

Which as you can see Geoff is extremely pleased about! (Honest – he really is)

So on Sunday (24th) we had Hurricane Richard which blew off our outside roof. There are pictures of what was the roof on here – it was the part that covered the outside seating area between the main building and the kitchen. But this is actually a blessing in disguise. We hated that roof and were contemplating changing it anyway so we are now in the process of picking out something nice before we have too much rain to flood the restaurant!

Finally followed by a broiler and two double deep-fat fryers

Then up came our heat lamps, coffee machines and microwaves

And shortly after the arrival of those, we had our Miami shipment in of kitchen equipment. Firstly the guys bought up the cooker, which Geoff promptly started assembling

We now have our equipment! We have a delivery of fridges and freezers from our local ‘B&Q’ store consisting of 6 small fridges, 2 glass-fronted fridges and 2 chest freezers

Well, from our previous post showing the entrance to the old kitchen, we have had the frame re-done as it did not go around the door itself. You can actually see where the frame used to go, but nearer opening we will be touching up areas including that one so hopefully you will see it less. But even now it looks a lot tidier!